5 Simple Techniques For apollo3
Still left: Within the VAB, the crawler transporter positions by itself down below Mobile Launcher one in preparing for rollout of SA-501 towards the start pad – Take note the worker while in the foreground for sizing comparison.On arrival at the Vertical Assembly Constructing, Every stage was inspected within a horizontal situation right before